project date:

01 January 2026

project duration:

12 months

category:

Road

client / company:

Roads and Buildings Department (R&B), Government of Gujarat

project location:

Jarod to Savli (via Samlaya), Taluka Savli, Vadodara District, Gujarat

Widening & Strengthening of Jarod-Samlaya-Savli Road (SH-63) Km. 0/0 to 17/7

Project information

This state highway improvement project widened the existing carriageway from 5.5 meters to 10 meters and strengthened the pavement over a 17.7 km stretch to accommodate higher traffic loads and improve road safety. Key works included pavement reconstruction/overlay, shoulder widening, drainage improvements, and structural enhancements for enhanced durability and all-weather usability. The upgrade boosts connectivity in the Savli industrial and rural belt, facilitating smoother movement of goods, reduced travel time, and supporting economic development in Vadodara District's peripheral areas.